It was only at one site that the generators failed, but it was two generators in that site:
In the single datacenter that did not successfully transfer to the generator backup, all servers continued to operate normally on Uninterruptable Power Supply (“UPS”) power. As onsite personnel worked to stabilize the primary and backup power generators, the UPS systems were depleting and servers began losing power at 8:04pm PDT. Ten minutes later, the backup generator power was stabilized, the UPSs were restarted, and power started to be restored by 8:14pm PDT. At 8:24pm PDT, the full facility had power to all racks.
It sounds like they were too optimistic about their generator startup times.
In the single datacenter that did not successfully transfer to the generator backup, all servers continued to operate normally on Uninterruptable Power Supply (“UPS”) power. As onsite personnel worked to stabilize the primary and backup power generators, the UPS systems were depleting and servers began losing power at 8:04pm PDT. Ten minutes later, the backup generator power was stabilized, the UPSs were restarted, and power started to be restored by 8:14pm PDT. At 8:24pm PDT, the full facility had power to all racks.
It sounds like they were too optimistic about their generator startup times.