If you use google maps to find the distance between Los Banos and Tehachapi. Via I5 is 210 miles. Via HWY99 is 223 miles. So a 13 mile difference. That's 5-7 minutes at high speed rail speeds.
And you are right the extra cost is minimal. It's probably $10-15 billion.
My thought about the grade separation costs and my beef is. One is those grade separation projects need to be done anyways. The beef is why is the high speed rail project paying for road infrastructure. That should come out of gas taxes or something.